欢迎访问东营市鸿翔塑胶制品有限公司官网! 

LEADER IN PLASTICS MANUFACTURING

We specially make agricultural and industrial tubes such as PVC spiral tubes, TPE riffled tubes, silicon sand tubes, anti-static tubes and PVC dust tubes

Add: Opposite to Hui’an Road Power Substation, Daozhuang Town, Guangrao County, Dongying, Shandong

E-mail:hongxiangsujiao@163.com

Tel:+86-546-6505088 Phone:+86-13793952957

Honsung Plastic

Tel:+86-546-6505088 Phone:+86-13793952957 E-mail:hongxiangsujiao@163.com

Copyright © 2018 Dongying Honsung Plastic Products Co., Ltd. All Rights Reserved. Powered by:www.300.cn 鲁ICP备11001857号

APPLICATION AREA

Annual report of 600 tons of PVC spiral pipe production line and civil engineering supporting project

Annual report of 600 tons of series PVC spiral pipe production line and civil construction supporting project project completion environmental protection acceptance inspection (survey) report

Construction unit:

Dongying Hongxiang Plastic Products Co., Ltd.

Prepared by:

Dongying Xingda Environmental Testing Technology Co., Ltd.

May 2018

Dongying Hongxiang Plastic Products Co., Ltd. produces an annual output of 600 tons of PVC spiral pipe production line and

Environmental Protection Acceptance (Investigation) Monitoring Report for Completed Civil Engineering Auxiliary Projects

Construction unit:

Dongying Hongxiang Plastic Products Co., Ltd.

legal representative:

Zhou Bo

Prepared by:

Dongying Xingda Environmental Testing Technology Co., Ltd.

legal representative:

Liu Jinhua

Project manager:

Zhou Bo

Construction unit:

Dongying Hongxiang Plastic Products Co., Ltd.

Prepared by:

Dongying Xingda Environmental Testing Technology Co., Ltd.

phone:

+86-546-6505088

phone:

++86-546-6917270

fax:

+86-546-6493288

fax:

--

Zip code:

257336

Zip code:

257300

address:

South of Hongqi Road, Daozhuang Town, Guangrao County

address:

No. 190, Yuehe Road, Guangrao County

table of Contents

Directory I

First, inspection project overview - 1 -

1.1 Acceptance Content and Scope - 2 -

1.1.1 Acceptance Content - 2 -

1.1.2 Acceptance Range - 2 -

1.2 Acceptance purpose - 2 -

Second, acceptance basis - 4 -

2.1 Environmental Protection-related Laws, Regulations, Rules and Regulations for Construction Projects - 4 -

2.2 Technical Specifications for Environmental Protection Acceptance of Completed Construction Projects - 5 -

2.3 Construction Project Environmental Impact Report (Form) and Examination and Approval Department Approval Decision - 5 -

2.4 Other Approval Documents of Environmental Protection Department, etc. - 5 -

III. Project Construction - 6 -

3.1 Geographical location and layout - 6 -

3.1.1 Geographic Location - 6 -

3.1.2 Plane layout - 6 -

3.2 Construction Content - 8 -

3.3 Main raw and auxiliary materials and fuel - 10 -

3.4 Water and Water Balance - 10 -

3.4.1 Water Supply - 10 -

3.4.2 Drainage - 11 -

3.5 Production Process and Contamination Section - 11 -

3.5.1 Production Process of PVC Soft/Hard Granules - 11 -

3.5.2 Production Process of PVC Spiral Pipe - 11 -

3.6 Project Changes - 12 -

IV. Environmental Protection Facilities - 13 -

4.1 Pollutant Treatment/Disposal Facilities and Measures - 13 -

4.1.1 Wastewater - 13 -

4.1.2 Exhaust gases - 13 -

4.1.3 Noise - 14 -

4.1.4 Solid waste - 14 -

4.2 Environmental Risk Prevention Facilities - 15 -

4.2.1 Environmental Risk Prevention Facilities - 15 -

4.2.2 Online Monitoring Device - 16 -

4.2.3 Other Facilities - 16 -

4.3 Investment in Environmental Protection Facilities and Implementation of the "Three Simultaneous Measures" - 17 -

4.3.1 Investment in Environmental Protection Facilities - 17 -

4.3.2 Implementation of "Three Simultaneous Measures" - 17 -

4.3.3 EIA Approval and Implementation - 18 -

V. Main conclusions of the EIA report form for the construction project and the examination and approval department's approval decision - 19 -

5.1 Major EIA Conclusions and Recommendations - 19 -

5.1.1 Main EIA Conclusions of this Project - 19 -

5.1.2 Environmental Impact Assessment of the Project - 19 -

5.2 EIA Approvals - 19 -

Sixth, acceptance of the implementation of standards - 21 -

VII. Acceptance Monitoring Content - 22 -

7.1 Exhaust gases - 22 -

7.1.1 Organized Exhaust Gas - 22 -

7.1.2 Unorganized Exhaust Gas - 22 -

7.2 Noise - 22 -

7.3 Ambient Air - 22 -

7.4 Environmental noise - 22 -

VIII. Quality Assurance and Quality Control - 23 -

8.1 Monitoring and Analysis Methods - 23 -

8.2 Monitoring Instruments - 23 -

8.3 Qualification of personnel - 23 -

8.4 Quality Assurance and Quality Control in Gas Monitoring and Analysis Process - 23 -

8.5 Quality Assurance and Quality Control in the Process of Noise Monitoring and Analysis - 24 -

Nine, acceptance monitoring results - 25 -

9.1 Production Conditions - 25 -

9.2 Monitoring Results of Pollutant Emissions and Effect Analysis of Environmental Protection Facilities - 25 -

9.2.1 Pollutant Emission Monitoring Results - 25 -

9.2.2 Effect Analysis of Environmental Protection Facilities - 27 -

9.3 Environmental Impact of Project Construction - 27 -

9.3.1 Ambient Air Monitoring Results - 27 -

9.3.2 Environmental noise - 28 -

X. Acceptance Monitoring Conclusions - 29 -

10.1 Basic Conditions of Engineering - 29 -

10.2 Environmental Protection Implementation - 29 -

10.3 Acceptance Conclusions - 29 -

10.4 Acceptance Proposals - 30 -

11. Registration Form for Acceptance of "Three Simultaneous" Projects for Environmental Protection of Construction Projects - 31 -

Accessories - 32 -

Annex I Power of Attorney for Acceptance of Environmental Protection for Construction Projects - 32 -

Annex II EIA Approvals - 33 -

Annex III EIA conclusions and recommendations - 34 -

Annex IV Punishment Decision List - 36 -

Annex V Registration Form for Project Registration - 38 -

Annex VI Waste Plasticizer Recycling Protocol - 39 -

Annex 7 Self-inspection report - 40 -

Annex VIII Completion of Completion Time and Self-inspection - 43 -

Annex IX Production Schedule - 44 -

Annex X Test Report - 45 -